In the frame of the CADI project, a 6 kW solar-wind station was installed in the Aral-Eco ecological camp on the shore of Kamystybas lake (Aral Sea region) in early July 2020. The camp is a joint project of the Barsakelmes State Nature Reserve and the International Fund for Saving the Aral Sea (IFAS). The appearance of an additional alternative energy source in such a grid off place will enhance the capacities of the ecological camp. Among other activities, it is planned to hold various educational seminars and trainings.